Rebuild Illinois to fund road projects here

Illinois Gov. JB Pritzker and the Illinois Department of Transportation recently announced the second of six $250 million grants to counties, municipalities and townships to address local transportation needs
Made possible thanks to the bipartisan Rebuild Illinois capital plan, the first infrastructure program in Illinois in nearly a decade and the largest in state history, the funding ensures continued investment in Illinois’ transportation systems, and helps maintain safe and reliable infrastructure at the local level.
“For too long, Illinois has relied on legacy infrastructure investments without tending to them properly to maintain our status as a transportation hub for the nation. Rather than build on our storied history and strong foundation, our critical infrastructure has been allowed to deteriorate,” Pritzker said.
“Thanks to dedicated funding in the bipartisan Rebuild Illinois plan, we’re investing in our roads and bridges and cementing our leadership position as a global transportation powerhouse,” Pritzker said.
This announcement is part of $1.5 billion being distributed over three years to advance municipal, township and county projects statewide.
Eligible projects include road and bridge improvements, traffic signal upgrades, new storm sewers and bike paths, sidewalk replacement and other long-term maintenance needs.
Projects will be selected and managed locally with IDOT oversight.
“In Illinois, we don’t have just state or local roads and bridges, but one system of transportation that stretches across all modes and involves multiple partners working together,” said Acting Transportation Secretary Omer Osman said.
“This funding through Rebuild Illinois means our cities, neighborhoods and rural areas have the resources they need during this uncertain time, but also enhances quality of life, encourages additional investment and improves safety for years to come.”
The local component of the Rebuild Illinois grant program is distributed via the state motor fuel tax formula, which resulted in an additional $860 million for counties, municipalities and townships in the past fiscal year alone.
Passed in 2019, Pritzker’s historic and bipartisan Rebuild Illinois is investing a total $33.2 billion into the state’s aging transportation system, creating jobs and promoting economic growth.
Rebuild Illinois is not only the largest capital program in state history, but also the first one that touches all modes of Illinois transportation: roads and bridges, transit, waterways, freight and passenger rail, aviation, and bicycle and pedestrian accommodations.
As part of the recently announced FY2021-26 Proposed Highway Improvement Program, IDOT is investing a total of $21.3 billion to improve roads and bridges over the next six years, the second multiyear plan that captures the impact of Rebuild Illinois.
Of that, $4.7 billion will be dedicated to local transportation systems.
The projects scheduled for Fayette County through Rebuild Illinois are:
• New bridge deck over Hurricane Creek, 2.9 miles east of Bond County line, $4.44 million.
• Bridge joint repair/replacement on Interstate 70 under U.S. Route 40 at Vandalia interchange, $430,000.
• New bridge deck, beam replacement, joint repair/replacement and painting on Interstate 70 under U.S. Route 51 at Vandalia interchange, $5.48 million.
• Bridge deck overlay, joint replacement and repairs on Interstate 70 at Camp Creek, two miles east of Vandalia, $2.15 million.
• Bridge joint replacement/repair, deck overlay and deck repairs on Interstate 60 over CSX rail line, 1.5 miles west of U.S. 40 (Brownstown interchange), $1.49 million.
• Designed overlay resurfacing on Interstate 70 at the Kaskaskia River, east of Vandalia 1 mile west to U.S. Route 40, $8.930 million.
• Standard overlay, U.S. Route 40, from Bond County line to Hurricane Creek, $1.12 million.
• Designed overlay, U.S. Route 40, Hurricane Creek to half a mile west of I-70 interchange, $2.28 million.
• Designed overlay, U.S. Route 40, half a mile west of Interstate 70 to Ill. Route 185 in Vandalia and interchange ramps, $2.02 million.
• Designed overlay and ADA improvements, U.S. Route 40, Ill. Route 185 and Veterans Avenue, .2 of a mile east of Vandalia railroad to .2 of a mile west of U.S. Route 51 in Vandalia, $300,000.
• New bridge, U.S. Route 40, brickyard branch at WCL of St. Elmo, $810,000.
 

Leave a Comment